
Upstairs showing floor layed and insulation at roof.

Upper floor now plastered and first coat of paint.


Ground floor area and ceilings just been plastered.

Outside of academy completed.

Upper floor showing front windows, wooden dummy & Black sash gallery photos on wall

Upper floor showing side windows, lion heads on wall & 2nd wooden dummy

Upper floor showing back wall area

Upper floor showing entrance door and weapons rack

Downs stairs showing side wall and some of the punch bags, speed ball & floor to ceiling ball

Down stairs showing front corner with boxing ring and more bags

Down stairs showing back corner with punch bob and bags etc